CID003324 — QINGDAO SHANGZHENG METAL CO., LTD.
RMAP Compliance & Remediation Assessment
Committed to undergo an RMAP third-party audit; audit is scheduled or currently in progress. Accepted by most OEMs with ongoing monitoring.
Acceptable with tracking — verify audit completion before next reporting cycle.
RMAP Active gold smelter/refiner (CHINA).
Use exact canonical RMI facility name above.
CMRT v6.5 'Smelter List' Tab Reporting Guide
Copy these exact canonical fields into columns A–F of the RMI CMRT v6.5 Smelter List worksheet to pass OEM portal and RMI Checker validation without formula errors.
| CMRT v6.5 Column | Canonical Value | Validation Rule |
|---|---|---|
| Metal (Column A) | Gold | Must match the declared Q1 3TG metal exactly. |
| Smelter Look-up (Column B) | QINGDAO SHANGZHENG METAL CO., LTD. | Select canonical name from RMI v6.5 dropdown so CID auto-populates. |
| Smelter Name (Column C) | QINGDAO SHANGZHENG METAL CO., LTD. | Avoid legacy aliases, distributors, or metal traders. |
| Smelter Country (Column D) | CHINA | Use official RMI country spelling. |
| Smelter Identification (Column E) | CID003324 | 9-character canonical RMI identifier (CID + 6 digits). |
| Source of Smelter ID Number (Column F) | RMI | Standard source code for official RMI CID00xxxx entries. |
Frequently Asked Compliance Questions
Is CID003324 (QINGDAO SHANGZHENG METAL CO., LTD.) RMAP Conformant on the RMI Standard Smelter List?
CID003324 (QINGDAO SHANGZHENG METAL CO., LTD., China) is an official RMI Gold smelter/refiner currently classified as RMAP Active. Committed to undergo an RMAP third-party audit; audit is scheduled or currently in progress. Accepted by most OEMs with ongoing monitoring.
How do I report CID003324 on the CMRT v6.5 Smelter List tab?
Enter Metal = "Gold", Smelter Look-up / Name = "QINGDAO SHANGZHENG METAL CO., LTD.", Smelter Country = "CHINA", Smelter Identification = "CID003324", and Source of Smelter ID Number = "RMI".
What compliance action is required if a supplier declares CID003324?
Acceptable with tracking — verify audit completion before next reporting cycle. Upload all supplier CMRTs to CMRTReady Workbench to automatically cross-check every CID, Q1–Q7 rule, and draft supplier remediation emails.
Related RMAP Smelters
Other official RMI facilities refining the same 3TG metal or operating in the same country.
Found this CID inside your supplier CMRT spreadsheets?
Drop all 5–250 supplier Excel & PDF declarations into CMRTReady Workbench to automatically repair aliases, isolate high-risk refiners, draft supplier rejection emails, and export a clean CMRT v6.5 workbook.